Massachusetts
Who may prepare a stormwater plan in Massachusetts
Massachusetts requires a credentialed preparer only in some cases. Plan scope rather than acreage: Attaches when a project is subject to the MassDEP Stormwater Management Standards under the Wetlands Protection Act, 310 CMR 10.05(6)(k)-(q) — stormwater discharge within an Area Subject to Protection or the 100-ft Buffer Zone, filed via Notice of Intent (or 401 Water Quality Certification). Exempt per 310 CMR 10.05(6)(l): single-family homes; 4-lot/4-unit-or-fewer projects with no discharge affecting a critical area; emergency road/drainage repairs..
The answer
ConditionalMassachusetts requires a credentialed preparer only in some cases. Plan scope rather than acreage: Attaches when a project is subject to the MassDEP Stormwater Management Standards under the Wetlands Protection Act, 310 CMR 10.05(6)(k)-(q) — stormwater discharge within an Area Subject to Protection or the 100-ft Buffer Zone, filed via Notice of Intent (or 401 Water Quality Certification). Exempt per 310 CMR 10.05(6)(l): single-family homes; 4-lot/4-unit-or-fewer projects with no discharge affecting a critical area; emergency road/drainage repairs..
What triggers it: Plan scope rather than acreage: Attaches when a project is subject to the MassDEP Stormwater Management Standards under the Wetlands Protection Act, 310 CMR 10.05(6)(k)-(q) — stormwater discharge within an Area Subject to Protection or the 100-ft Buffer Zone, filed via Notice of Intent (or 401 Water Quality Certification). Exempt per 310 CMR 10.05(6)(l): single-family homes; 4-lot/4-unit-or-fewer projects with no discharge affecting a critical area; emergency road/drainage repairs..
Credentials that qualify
- Registered Professional Engineer (licensed under M.G.L. c. 112, Section 81R)
The bare CMR text (310 CMR 10.05(6)(k)-(q), the ten Stormwater Management Standards) contains no PE requirement; the only PE language in the regulation itself is the unrelated, explicitly discretionary 310 CMR 10.05(6)(h) ('issuing authority may require... when in its judgment the complexity... warrants'). The real, mandatory RPE requirement lives in the Massachusetts Stormwater Handbook, Vol. 3 Ch. 1, which 310 CMR 10.05(6)(k) expressly incorporates by reference to define compliance with the Standards — a genuine mandate tied to a specific licensing statute (M.G.L. c. 112 Section 81R), not a discretionary or checklist-level convention, though it is Handbook guidance incorporated by reference rather than literal CMR regulatory text. The MassDEP Stormwater Report Checklist (the previously cited source) merely operationalizes this pre-existing Handbook mandate; it did not create it. This is a state-layer requirement, separate from the federal 2022 CGP, which imposes no SWPPP preparer credential.
What this means for a generated plan
Where a credential applies, or where we cannot confirm that none does, treat a generated document as a complete draft for a credentialed preparer to review, amend and sign. It is not by itself a compliant filed plan, and ours says so on its face.
Screen a Massachusetts site, credential answer included
What people ask about preparing a SWPPP in Massachusetts
Do I need a qualified preparer for a SWPPP in Massachusetts?
Massachusetts requires a credentialed preparer only in some cases. Plan scope rather than acreage: Attaches when a project is subject to the MassDEP Stormwater Management Standards under the Wetlands Protection Act, 310 CMR 10.05(6)(k)-(q) — stormwater discharge within an Area Subject to Protection or the 100-ft Buffer Zone, filed via Notice of Intent (or 401 Water Quality Certification). Exempt per 310 CMR 10.05(6)(l): single-family homes; 4-lot/4-unit-or-fewer projects with no discharge affecting a critical area; emergency road/drainage repairs..
Does a professional engineer have to stamp the plan in Massachusetts?
A PE stamp is required in Massachusetts. Trigger: Massachusetts Stormwater Handbook, Volume 3, Chapter 1 requires the Stormwater Report to be prepared under the direction of, and its Certification and Checklist stamped and signed by, a Registered Professional Engineer, for any project subject to the Wetlands Protection Act stormwater standards..
Get the answer before somebody starts drafting
Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.