The stormwater permit for construction in Arkansas
Arkansas runs its own NPDES programme, so a state issued construction general permit governs. Below is what our engine can say about it, and where we have not read that permit, what it will not say.
Governing permit
Authorization to Discharge Stormwater Under the NPDES and the Arkansas Water and Air Pollution Control Act (Construction General Permit ARR150000)
- Issued by
- Arkansas Department of Energy and Environment, Division of Environmental Quality (Arkansas DEQ), Office of Water Quality
- Permit number
- ARR150000
- Version determined against
- as published by the state agency
- Effective
- 2021-11-01
- Expires
- 2026-10-31
Who may prepare the plan
No preparer credential foundNo preparer credential was found for Arkansas. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
No preparer credential found in the reviewed sources. Not exhaustively verified; confirm with the state agency and any local ordinance.
No permit section cited. Confirm this with your permitting authority.
Does a site in Arkansas need coverage
Worked for a one acre site as a reference point. Change the acreage in the tool below and the answer, and its reasoning, change with it.
Coverage
Permit coverage required
The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.
Determined against dataset version 2026-07-19.
Read these before you act on the answer
- Requirements below are what we have read and cited directly from Authorization to Discharge Stormwater Under the NPDES and the Arkansas Water and Air Pollution Control Act (Construction General Permit ARR150000), not the federal CGP. A category we have not yet transcribed from this permit is omitted here rather than assumed to match EPA's rule.
- AR specifies stabilization INITIATION deadlines but not an acreage-tiered stabilization COMPLETION deadline like federal Table 2. AR does not specify a fixed day-count deadline for submitting a Notice of Termination after final stabilization (only that the operator 'may submit' the NOT once stabilized), so deadline.not.submission was omitted. No distinct 'identify corrective action within X hours' documentation deadline separate from the 3-business-day repair-completion deadline was found.
- No preparer credential was found for Arkansas. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
- Basinwise does not perform the physical site inspections the permit requires. Those must be carried out on site by a qualified person.
How this answer was reached, step by step
- 1
Coverage threshold
The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.
- 2
Permitting authority
Arkansas. The state runs its own programme under ARR150000.
- 3
Preparer credential
No preparer credential was found for Arkansas. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
What to do next
- 1. Confirm the governing permit. Read Authorization to Discharge Stormwater Under the NPDES and the Arkansas Water and Air Pollution Control Act (Construction General Permit ARR150000) directly. It is linked above, and it is the document an inspector will hold you to. Arkansas Department of Energy and Environment, Division of Environmental Quality (Arkansas DEQ), Office of Water Quality
- 2. Settle the preparer question before you draft. Getting this wrong costs a redraft at best. The detail is on the credential page for this state. Preparer credential in Arkansas
- 3. Screen the site. Run the real acreage and receiving water facts through the tool below. You get the inspection frequency, the stabilisation deadlines and the filing path with the permit section behind each.
- 4. Read the requirements in full. SWPPP requirements in Arkansas
Screen a Arkansas site now
Runs in your browser. Nothing about the site is transmitted.
What people ask about the Arkansas construction stormwater permit
Do I need a stormwater permit for a construction site in Arkansas?
Permit coverage is triggered at one acre of land disturbance, and below one acre if the project is part of a larger common plan of development or sale that will ultimately disturb an acre or more. The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.
Who issues the construction stormwater permit in Arkansas?
Arkansas Department of Energy and Environment, Division of Environmental Quality (Arkansas DEQ), Office of Water Quality issues Authorization to Discharge Stormwater Under the NPDES and the Arkansas Water and Air Pollution Control Act (Construction General Permit ARR150000).
Does Arkansas require a qualified preparer for the plan?
No preparer credential was found for Arkansas. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
Keep the record Arkansas will ask you for
The screening is free. Holding the written plan and the retained inspection log is what the permit actually demands.