Washington

The stormwater permit for construction in Washington

Washington runs its own NPDES programme, so a state issued construction general permit governs. Below is what our engine can say about it, and where we have not read that permit, what it will not say.

Governing permit

Construction Stormwater General Permit (CSWGP), issued November 19, 2025, effective January 1, 2026

Issued by
Washington State Department of Ecology (Ecology)
Version determined against
as published by the state agency
Effective
2026-01-01
Expires
2030-12-31

Who may prepare the plan

No preparer credential found

No preparer credential was found for Washington. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.

CSWGP Section 9 contains no professional-engineer or licensure requirement. CESCL is inspection-scoped under S4.B.

No permit section cited. Confirm this with your permitting authority.

Does a site in Washington need coverage

Worked for a one acre site as a reference point. Change the acreage in the tool below and the answer, and its reasoning, change with it.

Coverage

Permit coverage required

Verified

The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

Determined against dataset version 2026-07-19.

Read these before you act on the answer

  • Requirements below are what we have read and cited directly from Construction Stormwater General Permit (CSWGP), issued November 19, 2025, effective January 1, 2026, not the federal CGP. A category we have not yet transcribed from this permit is omitted here rather than assumed to match EPA's rule.
  • No explicit permit/order number (e.g., a 'WAR-xxxxxx' style code) appears anywhere on the permit cover page, errata, or table of contents of either the current 2026 permit or the prior 2015/2020 permit checked for comparison — Washington identifies this general permit by name plus issuance/effective/expiration dates only, not a discrete number. No numeric buffer setback distance (feet) is specified in the permit itself; it requires 'natural buffers around surface waters' (S9.D.4.e) but defines 'Buffer' as an area designated by the local jurisdiction (Appendix A), so no state-level distanceFeet value could be verified. No fixed-hour deadline for producing/submitting the routine inspection report itself was found (only content requirements). NOT (Notice of Termination) has no fixed day-count filing deadline — it is filed once a site becomes eligible, so it was not forced into the federal 'deadline.not.submission' shape.
  • No preparer credential was found for Washington. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
  • Basinwise does not perform the physical site inspections the permit requires. Those must be carried out on site by a qualified person.
How this answer was reached, step by step
  1. 1

    Coverage threshold

    The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

    VerifiedPart 1.1.2Source
  2. 2

    Permitting authority

    Washington. The state runs its own programme, issued as an unnumbered or rule-based general permit rather than under a discrete permit number.

  3. 3

    Preparer credential

    No preparer credential was found for Washington. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.

What to do next

  1. 1. Confirm the governing permit. Read Construction Stormwater General Permit (CSWGP), issued November 19, 2025, effective January 1, 2026 directly. It is linked above, and it is the document an inspector will hold you to. Washington State Department of Ecology (Ecology)
  2. 2. Settle the preparer question before you draft. Getting this wrong costs a redraft at best. The detail is on the credential page for this state. Preparer credential in Washington
  3. 3. Screen the site. Run the real acreage and receiving water facts through the tool below. You get the inspection frequency, the stabilisation deadlines and the filing path with the permit section behind each.
  4. 4. Read the requirements in full. SWPPP requirements in Washington

Screen a Washington site now

Runs in your browser. Nothing about the site is transmitted.

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about the Washington construction stormwater permit

Do I need a stormwater permit for a construction site in Washington?

Permit coverage is triggered at one acre of land disturbance, and below one acre if the project is part of a larger common plan of development or sale that will ultimately disturb an acre or more. The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

Who issues the construction stormwater permit in Washington?

Washington State Department of Ecology (Ecology) issues Construction Stormwater General Permit (CSWGP), issued November 19, 2025, effective January 1, 2026.

Does Washington require a qualified preparer for the plan?

No preparer credential was found for Washington. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.

Keep the record Washington will ask you for

The screening is free. Holding the written plan and the retained inspection log is what the permit actually demands.