Plan before Notice of Intent
SWPPP must be completed prior to the start of construction (or applicable construction phase)
The SWPPP must be completed prior to the start of construction (or the applicable construction phase).
North Dakota
North Dakota issues its own construction general permit. We have read General Permit for Stormwater Discharges from Construction Activities (NDR11-0000) and list below the requirements we could cite to it, with the scope limits stated plainly. Screen your own acreage further down.
Who may prepare the plan
No preparer credential foundNo preparer credential was found for North Dakota. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
Credential: the permit contains no preparer credential requirement. It imposes an annual training obligation on personnel implementing the plan.
No permit section cited. Confirm this with your permitting authority.
Coverage trigger
The project disturbs 3 acres, at or above the 1 acre threshold, so it needs permit coverage.
The trigger people miss is the second one. A half acre lot inside a 40 acre subdivision is covered, because the larger common plan of development or sale is what counts, not the lot.
Worked for a three acre site with the receiving water unconfirmed. Each line says why it attached to this site rather than in general. Check the notes above for the site sizes this permit does not cover.
SWPPP must be completed prior to the start of construction (or applicable construction phase)
The SWPPP must be completed prior to the start of construction (or the applicable construction phase).
Submit before commencing construction activities; the exact lead time is not recorded for this id.
Why this applies here: This is the deadline for a new site. A transfer to a new operator or an emergency related project has a different deadline.
Permit coverage will become effective seven (7) days after you submit a complete NOI unless otherwise notified by the department (based on the department receipt date).
Submit the Notice of Termination once a termination condition is met; the exact deadline is not recorded for this id.
Permittees should submit a NOT within 30 days after final stabilization has been achieved, or another owner/operator (permittee) has assumed control according to Part I(F) for all areas of the site that have not undergone final stabilization.
Once every 14 calendar days.
Why this applies here: You have not confirmed whether the site discharges to an impaired or high quality water. If it does, the increased frequency applies instead and this answer changes.
Inspections shall be performed by or under the direction of the permittee. Inspections shall be performed at least once every 14 calendar days and within 24 hours after any storm event of greater than 0.25 inches of rain per 24-hour period.
person knowledgeable and experienced in the application of erosion and sediment control BMPs
Why this applies here: This is why Basinwise cannot perform your inspections. The permit requires a trained person physically on the site.
The SWPPP must identify a person knowledgeable and experienced in the application of erosion and sediment control BMPs who will oversee the implementation of the SWPPP, and the installation, inspection, and maintenance of the erosion and sediment control BMPs before and during construction until a NOT is filed.
immediately (no later than end of next work day) if idle 14+ calendar days
Why this applies here: This applies at both land disturbance amounts.
Stabilization must be initiated immediately where activities have been permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding fourteen (14) calendar days.
Confirm the exact minor-fix deadline against the cited permit section.
Corrective actions must be made prior to the next anticipated rainfall event or within 24 hours of discovery (whichever comes first), or as soon as field conditions allow access.
Confirm the exact major-fix deadline against the cited permit section.
Sedimentation basins must be drained and the sediment removed when the depth of sediment collected in the basin reaches 1/2 the storage volume. Drainage and removal must be completed within 72 hours of discovery, or as soon as field conditions allow access.
Provide and maintain a natural buffer or equivalent erosion and sediment controls near surface waters; the exact distance is not recorded for this id.
A 50-foot natural buffer or equivalent erosion and sediment controls must be provided when a project is within 50 feet of a surface water and stormwater flows to the surface water. ... If working within 100 feet of a surface water listed as impaired for sediment, suspended solids or turbidity, a 100-foot natural buffer or equivalent sediment and erosion controls must be provided.
Document the condition and its completion; the exact documentation deadline is not recorded for this id.
Findings of inspections, including recordings or imagery if utilized, and recommendations and time frame for corrective actions;
Retain inspection reports and the corrective action log; the exact retention period is not recorded for this id.
Why this applies here: The clock runs from permit expiry or termination, not from when the record was written, so on a multi year project every record stays live for the whole project plus three years.
All records and documentation required by this permit shall be kept by the permittee for at least three years from the date that permit coverage expires or is terminated or longer if requested by the department or EPA.
Your acreage, your receiving water, your answer. Runs in your browser, nothing is transmitted.
This is EPA's list, from the 2022 Construction General Permit. It does NOT govern in North Dakota, where the state issues its own permit and sets its own contents. It is here as a shape to expect, not as the requirement you will be held to.
Read the permit itself at the source document.
North Dakota issues its own construction general permit, and we have read General Permit for Stormwater Discharges from Construction Activities (NDR11-0000). The requirements listed on this page, such as inspection frequency, who may inspect, stabilisation, corrective action and record retention, are cited to that permit rather than to EPA's. Anything we have not transcribed is left out instead of assumed to match the federal rule, and the scope note on this page says which sites the permit does not cover. Confirm the current permit and any site-size variant with North Dakota Department of Environmental Quality (ND DEQ).
No preparer credential was found for North Dakota. On what we have verified, a generated plan can be adopted by the operator without a credentialed signature. Local ordinances can still be stricter than state law.
The inspection frequency is set by the North Dakota construction general permit, which we have not read. Confirm it with North Dakota Department of Environmental Quality (ND DEQ).
Screening is free. Pro generates the site specific plan document and retains the inspection and corrective action log.