Who may prepare a stormwater plan in Rhode Island

Rhode Island requires a credentialed preparer only in some cases. Sites above 5 acres.

The answer

Conditional

Rhode Island requires a credentialed preparer only in some cases. Sites above 5 acres.

What triggers it: Sites above 5 acres.

Credentials that qualify

  • Registered Professional Engineer (PE) licensed in Rhode Island
  • Certified Professional in Erosion and Sediment Control (CPESC)
  • Certified Professional in Storm Water Quality (CPSWQ)
  • Registered Landscape Architect (RLA) licensed in Rhode Island

RI's primary erosion-control deliverable is a Soil Erosion and Sediment Control (SESC) plan, not a 'SWPPP' (a separate Stormwater Management Plan / O&M plan covers post-construction requirements; a stand-alone SWPPP is optional at the 1-5 acre tier). Gating is acreage-tiered: under 1 acre and not part of a larger common plan needs no coverage; 1 to under 5 acres requires an application but a stand-alone credentialed SESC plan is optional (details can appear on the site plan set) unless DEM's Director requests one; 5 acres or more requires a full Stormwater Management Plan including a stand-alone SESC plan that must be stamped by one of the four routes above. A PE stamp is commonly assumed mandatory here but is not — CPESC, CPSWQ and RLA are equally valid non-PE pathways, with PE required only when the plan's content specifically requires the practice of engineering. No RI-specific state training course (comparable to Alaska's AK-CESCL) was found; all qualifying credentials are third-party/national certifications or state professional licenses.

Verified2025 RIPDES Construction General Permit (effective 9/26/2025), Part III.C (SESC plan stamping/signing requirement), Part III.F (amendments), Part I.D.1.a.i-ii and Part I.D.1.b items 8-9Source

What this means for a generated plan

Where a credential applies, or where we cannot confirm that none does, treat a generated document as a complete draft for a credentialed preparer to review, amend and sign. It is not by itself a compliant filed plan, and ours says so on its face.

Screen a Rhode Island site, credential answer included

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about preparing a SWPPP in Rhode Island

Do I need a qualified preparer for a SWPPP in Rhode Island?

Rhode Island requires a credentialed preparer only in some cases. Sites above 5 acres.

Does a professional engineer have to stamp the plan in Rhode Island?

A PE stamp is required in Rhode Island. Trigger: A PE stamp/signature is required only when the Soil Erosion and Sediment Control (SESC) plan 'requires the practice of engineering' under RI's PE licensure law (Part III.C). When it does not, a CPESC, CPSWQ, or Registered Landscape Architect stamp is explicitly sufficient. Any later amendment to control measures that itself involves the practice of engineering must likewise be reviewed, signed and stamped by an RI-registered PE (Part III.F)..

Get the answer before somebody starts drafting

Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.