Utah

The stormwater permit for construction in Utah

Utah runs its own NPDES programme, so a state issued construction general permit governs. Below is what our engine can say about it, and where we have not read that permit, what it will not say.

Governing permit

General Permit for Storm Water Discharges from Construction Activities (Construction General Permit), UPDES Permit No. UTRC00000

Issued by
Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality
Permit number
UTRC00000
Version determined against
as published by the state agency
Effective
2024-07-01
Expires
2029-06-30

Who may prepare the plan

Conditional, depends on the site

Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.

Qualifying routes

  • Utah Registered SWPPP Writer (RSW)
  • Licensed Professional Engineer (PE) in a related field
  • Professional Geologist (PG)
  • Certified Professional in Erosion and Sediment Control (CPESC)
  • Certified Professional in Storm Water Quality (CPSWQ)
  • National Institute for Certification in Engineering Technologies (NICET), Erosion and Sediment Control, Level 3

The gate is not a flat 5-acre cutoff: Part 7.2 requires a qualified SWPPP writer for any project disturbing more than 5 acres, AND for small (1-5 acre) projects that have a perennial surface water within 50 feet or a steep slope (70% or 35 degrees or more, with 10+ feet of elevation change). Below that threshold, no certified preparer is required at all. A PE stamp is explicitly not required by itself — a licensed PE (or PG) is one of five interchangeable acceptable qualifications alongside RSW, CPESC, CPSWQ and NICET Level 3, commonly overstated as mandatory. Verified against the permit's Part 7.2 text and independently cross-checked against a March 2026 official SWPPP compliance-evaluation checklist for the current permit, which cites identical section numbers and triggers.

VerifiedUtah Construction General Permit (UTRC00000), Part 7.2 "SWPPP Writer/Reviewer Certification Requirement" and Part 7.2.1.a-eSource

Does a site in Utah need coverage

Worked for a one acre site as a reference point. Change the acreage in the tool below and the answer, and its reasoning, change with it.

Coverage

Permit coverage required

Verified

The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

Determined against dataset version 2026-07-19.

Read these before you act on the answer

  • Requirements below are what we have read and cited directly from General Permit for Storm Water Discharges from Construction Activities (Construction General Permit), UPDES Permit No. UTRC00000, not the federal CGP. A category we have not yet transcribed from this permit is omitted here rather than assumed to match EPA's rule.
  • No numeric effluent limits/benchmarks were found in the permit body for standard sites -- like the federal 2022 CGP, this UT permit relies on narrative technology-based requirements. No explicit fixed-day NOI-before-commencement deadline was found in Part 1.4, so deadline.noi.newSite is omitted rather than guessed. Utah's stabilization deadlines are day-count based (not acreage-tiered like federal Table 2), so a state.ut id was created instead.
  • Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.
  • Basinwise does not perform the physical site inspections the permit requires. Those must be carried out on site by a qualified person.
How this answer was reached, step by step
  1. 1

    Coverage threshold

    The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

    VerifiedPart 1.1.2Source
  2. 2

    Permitting authority

    Utah. The state runs its own programme under UTRC00000.

  3. 3

    Preparer credential

    Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.

    VerifiedUtah Construction General Permit (UTRC00000), Part 7.2 "SWPPP Writer/Reviewer Certification Requirement" and Part 7.2.1.a-eSource

What to do next

  1. 1. Confirm the governing permit. Read General Permit for Storm Water Discharges from Construction Activities (Construction General Permit), UPDES Permit No. UTRC00000 directly. It is linked above, and it is the document an inspector will hold you to. Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality
  2. 2. Settle the preparer question before you draft. Getting this wrong costs a redraft at best. The detail is on the credential page for this state. Preparer credential in Utah
  3. 3. Screen the site. Run the real acreage and receiving water facts through the tool below. You get the inspection frequency, the stabilisation deadlines and the filing path with the permit section behind each.
  4. 4. Read the requirements in full. SWPPP requirements in Utah

Screen a Utah site now

Runs in your browser. Nothing about the site is transmitted.

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about the Utah construction stormwater permit

Do I need a stormwater permit for a construction site in Utah?

Permit coverage is triggered at one acre of land disturbance, and below one acre if the project is part of a larger common plan of development or sale that will ultimately disturb an acre or more. The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

Who issues the construction stormwater permit in Utah?

Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality issues General Permit for Storm Water Discharges from Construction Activities (Construction General Permit), UPDES Permit No. UTRC00000.

Does Utah require a qualified preparer for the plan?

Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.

Keep the record Utah will ask you for

The screening is free. Holding the written plan and the retained inspection log is what the permit actually demands.